Client Problem
Our client had recently bought a large commercial building and was renovating to suit their manufacturing operations. A large section of the floor (200’x20’) had sunk towards the outside wall up to 4 inches and was unsuitable to build on.
Our Solution
Using our polyurethane foam technology we injected material through a series of 5/8" holes through the flor, which lifted the concrete and leveled the floor. The entire project only took 2 days to complete and allowed the rest of the renovation to continue with zero schedule impact.